The latest nuclear power plant built in the US is seven years behind schedule and almost $20 billion over budget. It bankrupted Westinghouse Energy, and is slated to cost consumers more than double what comparable electricity costs because of these overruns.
And this was a plant that was using newer construction techniques like offsite assembly to reduce costs.
Were there mistakes during the build process like lowballing spending figures or building time so they are permitted to build or did they just royally fuck up some other way?
The latest nuclear power plant built in the US is seven years behind schedule and almost $20 billion over budget. It bankrupted Westinghouse Energy, and is slated to cost consumers more than double what comparable electricity costs because of these overruns.
And this was a plant that was using newer construction techniques like offsite assembly to reduce costs.
Looks like one holdup nowadays is the ability to source HALEU (Uranium that is 4x as enriched as the typical fuel used in current reactors).
https://www.energy.gov/ne/articles/what-high-assay-low-enriched-uranium-haleu
https://www.wyomingpublicmedia.org/natural-resources-energy/2022-12-14/the-opening-of-terrapowers-nuclear-plant-in-kemmerer-will-be-delayed-by-two-years
It was sourceable from Russia before they invaded Ukraine.
Were there mistakes during the build process like lowballing spending figures or building time so they are permitted to build or did they just royally fuck up some other way?